Project Schedule:
SHA is focusing on the Joint Mobility Studies with VDOT. The Full Beltway Study is currently on hold.
Current Tasks:
The Study Team is currently working on the following tasks:
- Evaluating Express Toll Lane operations and benefits
- Continuing with the Joint Mobility Studies between SHA and VDOT on the west side and south side of the Beltway
- Evaluating the existing pavement and bridge conditions on the Maryland section of Beltway
Project Milestones:
| 2006 |
Continue evaluating ETL operations |
Summer 2006 |
Complete evaluation of existing pavement and bridge conditions |
| Fall 2007 |
Complete West Side and South Side Mobility Studies |