Project Schedule:

SHA is focusing on the Joint Mobility Studies with VDOT. The Full Beltway Study is currently on hold.

 

Current Tasks:

The Study Team is currently working on the following tasks:

  • Evaluating Express Toll Lane operations and benefits
  • Continuing with the Joint Mobility Studies between SHA and VDOT on the west side and south side of the Beltway
  • Evaluating the existing pavement and bridge conditions on the Maryland section of Beltway

 

Project Milestones:

2006

Continue evaluating ETL operations

Summer 2006

Complete evaluation of existing pavement and bridge conditions

Fall 2007

Complete West Side and South Side Mobility Studies

 